what are the general steps for professional laboratory design?

Jan 02, 2019

Professional laboratory construction is not only a simple combination of instruments and equipment, it is a complex system engineering, and is a construction that has strict requirements on the working environment. What are the laboratory construction steps? The laboratory design company will carry out the laboratory construction according to the following steps.

1.02

1. Laboratory construction planning

The laboratory construction plan includes the construction appearance, style, height, layout, etc. Before the construction of the laboratory, it is necessary to understand the customer's needs and future development direction and combine the laboratory construction experience of other related industries to plan and rationalize.

2, laboratory design

The process of concrete implementation of the program roots by professional means, including laboratory design, installation, commissioning, maintenance and upgrade.

3. Selection of laboratory construction units

The laboratory design and construction unit should select a company with a certain scale in China, and must strictly examine the strength and standard of the company. It is best to conduct on-site inspections of its completed successful cases and the location of the company.

4, the design of the laboratory layout

The layout design phase should consider the work and development needs as much as possible, rationally configure the space, and optimize the integration as much as possible. The laboratory layout is perfect to ensure the subsequent professional design of water, electricity and wind.

5, laboratory power distribution system

The laboratory's power distribution system is designed according to the specific requirements of experimental instruments and equipment, and is designed by a wide range of factors from professional designers. Because the requirements of the circuit equipment of the laboratory equipment are more complicated, the design of the power distribution system should not only consider the existing equipment and equipment, but also consider the development direction of the laboratory in recent years, fully consider the reservation of the power distribution system. And circuit maintenance and other issues.

6, laboratory air conditioning system

The air conditioning system not only controls the temperature and humidity of the laboratory, but also cooperates with the laboratory ventilation system to truly and effectively ensure the laboratory construction effect.

7, laboratory fire system

The requirements for fire protection in the laboratory will be higher than in ordinary places. The laboratory design should use different fire protection measures to ensure the fire safety of the laboratory.

8, laboratory water supply and drainage system

The piping of the drainage system shall be resistant to acid and alkali corrosion and the melting of organic materials. The material shall be PPR or other materials, and ordinary PVC pipes shall not be used. At the same time, according to the nature, flow rate and discharge law of the sewage and combined with outdoor drainage conditions. Set the plan.

9, laboratory gas supply system

The operation of many equipment in the laboratory requires a wide variety of gas supplies, and the safety of the cylinder chamber must be guaranteed.

10, laboratory ventilation system

The design of the laboratory exhaust system affects the health of the entire environment and the experimental personnel, and the operation and maintenance of the experimental equipment.

11, the choice of laboratory furniture

The choice of laboratory furniture should first be considered to fully meet the needs of the work, mainly related to the material of the countertop, cabinet structure and material, color matching and other elements.

12, laboratory interior decoration details

When the laboratory is renovated, the ceiling should not use a large overall structure, which will cause hidden dangers for subsequent construction and maintenance. Floor-to-ceiling glass curtain wall design can be used on both sides of the corridor or in the large instrument room, which is more transparent and easy to manage and visit.